Closing date
|
Title
|
Industry type
|
Status
|
07.08.2018 12:00 |
Poland-Warsaw: Design and build – construction of the 2nd Metro Line in Warsaw – Stage II
|
Energy Projects, Infrastructure Projects, Public Objects/Buildings, Railways
|
Non active |
02.08.2018 10:00 |
Poland-Warsaw: Design and build – revitalization of the railway lines Nos. 57 and 923 with additional works on the railway line No. 6
|
Infrastructure Projects, Railways
|
Non active |
17.07.2018 10:00 |
Poland-Warsaw: Design and build – railway traffic control (SRK) and telecommunication equipment for the E 59 railway line
|
Infrastructure Projects, Railways
|
Non active |
16.05.2018 10:00 |
Poland-Warsaw: Design and build – works on the railway lines no. 132, 147, 161, 180, 188, 654, 655, 657, 658
|
Infrastructure Projects, Railways
|
Non active |
08.05.2018 12:00 |
Poland-Warsaw: Design and build – electrification of the railway line No. 71 Ocice – Rzeszów
|
Infrastructure Projects, Railways
|
Non active |
26.04.2018 10:00 |
Poland-Warsaw: Reconstruction of the viaduct and revitalization of the flyover in Opole Wschodnie station
|
Infrastructure Projects, Railways
|
Non active |
20.04.2018 10:00 |
Poland-Warsaw: Design and build – reconstruction of the railway line No. 285 (section Świdnica Kraszowice-Jedlina Zdrój)
|
Infrastructure Projects, Railways
|
Non active |
13.04.2018 10:00 |
Poland-Warsaw: Design and build – LOT C – Works on the railway lines Nos. 131, 686, 687,704, section Kalina – Rusiec Łódzki
|
Infrastructure Projects, Railways
|
Non active |
12.04.2018 11:00 |
Poland-Warsaw: Design and build – LOT B – Works on the railway line No. 131, section Nakło Śląskie – Kalina
|
Infrastructure Projects, Railways
|
Non active |
10.04.2018 11:15 |
Poland-Chorzów: Modernization of the track and network infrastructure along 3 Maja street in Chorzów
|
Infrastructure Projects, Railways, Roads and Highways
|
Non active |