Skip to content
Infrastructure Projects
Airports/Aviation
Ports, Waterways and Shipping
Public Objects/Buildings
Railways
Roads and Highways
Energy Projects
Coal and Gas Power Plants
Hydroelectric Plants
Wind farms
Solar Plants
About Us
Our Team
Contact Us
Log in
srk system construction
Closing date
Title
Industry type
Status
17.07.2018 10:00
Poland-Warsaw: Design and build – railway traffic control (SRK) and telecommunication equipment for the E 59 railway line
Infrastructure Projects
,
Railways
Non active
12.01.2018 10:00
Poland-Warsaw: Design and build – railway traffic control devices (srk) (Layer I and II) on the railway line No. E 59
Infrastructure Projects
,
Railways
Non active
28.12.2017 10:00
Poland-Warsaw: Design and build – reconstruction of railway traffic control devices (srk) at the Leszno station
Infrastructure Projects
,
Railways
Non active